Northrop Grumman Systems Corporation
Federal Contractor · Rank #40
Spending by Agency
Recent Awards
| Description | Agency | Start Date | Amount |
|---|---|---|---|
| 200506!000026!5700!FA8214!OO-ALC/PKME/LMKE !F4261098C0001 !A!N! !Y! !P01502!20041213!20050701!001563738!004179453!016435559!N!NORTHROP GRUMMAN SPACE & MISSI!888 S 2000 E !CLEARFIELD !UT!84015!13850!011!49!CLEARFIELD !DAVIS !UTAH !-000001960000!N!N!000000000000!L014!TECH REP SVCS/GUIDED MISSILES !A2 !MISSILE AND SPACE SYSTEMS !302 !MINUTEMAN III GRP !541330!E! !3! ! !C! ! !20200930!B! ! !A! !A!N!L!2!002!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! ! | Department of Defense | Jul 1, 1998 | $10.0B |
| E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) | Department of Defense | Feb 15, 2018 | $8.5B |
| E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2) | Department of Defense | May 13, 2013 | $5.4B |
| FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS | National Aeronautics and Space Administration | Apr 17, 2006 | $4.4B |
| THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY. | National Aeronautics and Space Administration | Oct 1, 2003 | $4.3B |
| TAS::17 1319::TAS SYSTEM DEVELOPMENT AND DEMONSTRATION | Department of Defense | Apr 22, 2008 | $3.2B |
| NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY. | Department of Defense | Jun 25, 2018 | $3.1B |
| DESIGN, DEVELOPMENT, AND DEVELOPMENTAL TESTING OF THE NEXT GENERATION INTERCEPTOR (NGI) ALL-UP-ROUND (AUR) | Department of Defense | Mar 25, 2021 | $2.4B |
| 200208!000056!5700!CZ39 !SMC/PKZ LOS ANGELES AFB !F0470102C0009 !A!N! !N! !20020418!20100930!008324949!008324949!004179453!N!TRW INC !1 SPACE PARK BLVD !REDONDO BEACH !CA!90278!60018!037!06!REDONDO BEACH !LOS ANGELES !CALIFORNIA!+000010000000!N!N!000665000000!AC22!RDTE/MISSILE AND SPACE SYSTEMS-APPLIED RESEARCH !A2 !MISSILE AND SPACE SYSTEMS !3000!NOT DISCERNABLE OR CLASSIFIED !541710!E! !1! ! ! ! ! !99990909!B! ! !N!A!D!N!R!1!001!N!2A!A!Y!Z! ! !N!C!N! ! ! !A!Z!A!A!000!A!C!N! ! ! !Y! ! !0001! | Department of Defense | Apr 18, 2002 | $1.9B |
| MQ-4C TRITON LRIP LOT 5 LONG LEAD ITEMS TO SUPPORT U.S. NAVY AND COOPERATIVE PARTNER AUSTRALIA. | Department of Defense | May 29, 2019 | $1.8B |
| 200103!000014!5700!GV47 !ESC/JSK !F1962800C0100 !A!N!*!N! !20001211!20031231!938535028!008255408!016435559!N!NORTHROP GRUMMAN SYSTEMS CORPO!ONE HORNET WAY !EL SEGUNDO !CA!90245!22412!037!06!EL SEGUNDO !LOS ANGELES !CALIFORNIA!+000020000000!N!N!000000000000!5841!RADAR EQUIPMENT, AIRBORNE !A7 !ELECTRONICS AND COMMUNICATION !3000!NOT DISCERNABLE OR CLASSIFIED !334511!*!*!1! ! ! !*!*!*!B!*!*!A! !D !U!R!1!001!N!1G!A!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! !Y! ! !0001! | Department of Defense | Jan 11, 2000 | $1.7B |
| F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED | Department of Defense | May 31, 2017 | $1.7B |
| BATTLEFIELD AIRBORNE COMMUNICATIONS NODE RAPID FIELDING | Department of Defense | Jun 24, 2009 | $1.6B |
| IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | National Aeronautics and Space Administration | Sep 3, 2015 | $1.6B |
| G/ATOR GAN FRP LOT 1 QTY 4 | Department of Defense | Jun 7, 2019 | $1.5B |
| IRBM TARGETS | Department of Defense | Mar 7, 2011 | $1.5B |
| TO AWARD PRODUCTION EFFORT FOR THE PRECISION GUIDANCE KIT (PGK)TO INCLUDE ARMY, MARINES, FMS QUANTITIES, FFP, BASE WITH 2 OPTIONS INCLUDING SPECIAL LICENSE RIGHTS (TDP). | Department of Defense | Aug 30, 2013 | $1.5B |
| BLOCK 3 EA SUBSYSTEM HEMISPHERE PRODUCTION | Department of Defense | Sep 30, 2020 | $1.4B |
| GCSS-ARMY (F/T) | Department of Defense | Dec 5, 2007 | $1.3B |
| IGF::CT::IGF CONTRACT AWARD FOR CONTRACTOR LOGISTICS SUPPORT (CLS), ALSO REFERRED TO AS LIFE CYCLE SERVICES, FOR THE GOVERNMENT-OWNED FIXED WING FLEET PERFORMING SPECIAL ELECTRONIC MISSION AIRCRAFT (SEMA) MISSIONS (MC-12, C-12, RC-12, EO-5, B300, MODEL 300 AND RO-6A). | Department of Defense | Sep 1, 2017 | $1.2B |
All federal spending data sourced from USAspending.gov, the official source for federal award data as mandated by the Government Accountability Office.
Northrop Grumman Systems Corporation Federal Contracts FAQ
Northrop Grumman Systems Corporation has received $2,103,720,080 in total federal obligations across 25 awards and 25 contracts.
Northrop Grumman Systems Corporation works with 2 federal agencies, including Department of Defense, National Aeronautics and Space Administration. The largest agency relationships are based on total dollar obligations.
Northrop Grumman Systems Corporation has received federal awards in multiple states.
Northrop Grumman Systems Corporation is ranked #40 among the largest federal contractors by total obligation amount. Rankings are based on USASpending.gov data for FY2024.
Explore Other Federal Contractors
Spending figures represent total federal obligations for FY2024, as reported through USASpending.gov. Rankings are based on aggregate obligation amounts across all contract, grant, and direct payment awards.